Half Height Type (APG)

  • 문의하기
Prevention of Platform Fall (70%) Passenger’s Security of Sight is Possible Construction period can be reduced since it is installed in half-assembled state

Handrail installations aligned with the location of the car door (1.2 to 1.6 m) (applied to above-ground station)


Construction Examples

  • Two stations in Seoul Metro Line 2 including Ganbyun Station
  • 30 stations in Daegu Subway Line 3 including Myungdeok Station
Chinese English Korean